Mon - Fri 09:00 - 17:00+372 634 6234[email protected]

A vocational institution documents practical training hours by planning them in the program specification, recording them as they happen, linking them to supervision and assessment, and summarizing them in a statement of total workload. Reviewers want to see not only that practical hours are promised, but that they are delivered, supervised and counted according to a clear rule. A practical hour that is not recorded is, for accreditation purposes, an hour that cannot be shown.

This guide explains how to define practical hours, what records to keep, how to deal with workplace training and how to state the total. It supports institutions and programs preparing for Program Accreditation, Course Accreditation or institutional accreditation with the European Association for Higher Education Advancement (EAHEA).

What Counts as a Practical Hour

A practical hour is an hour in which the learner is performing, under supervision, the tasks of the occupation: working with tools in a workshop, practicing procedures in a laboratory, serving customers in a training restaurant, performing nursing skills on a manikin or doing a placement task at an employer. In EAHEA’s credit systems, workload includes instruction, practical work, guided self-study and assessment. Breaks, travel and waiting time are not counted. The institution should write a definition and apply it consistently.

The definition should state:

  • which activities count, with examples;
  • what level of supervision is required;
  • how partial hours and short sessions are treated;
  • how time spent on preparation and cleaning up is treated.

Planning the Hours

The program specification should state, for each unit or course, the planned practical hours and what the learner will do. A competency map that connects each competency to the sessions where it is practiced helps. Include the planned ratio of learners to supervisors and the capacity of each workshop, since these determine whether the hours can really be delivered. Compare planned hours with the equipment available. A program that promises 80 hours of welding per learner for 60 learners with four booths cannot deliver.

UnitCompetenciesPlanned Practical HoursLocationSupervisor Ratio
Electrical installationWiring, testing, fault finding90Workshop B1:10
Safety and toolsPPE, tool use, risk checks20Workshop A1:12

Recording the Hours

Keep records that show the hours happened.

  • Attendance registers for each practical session, signed or recorded electronically, showing date, start and end time, group and supervisor.
  • Learner logbooks in which each learner records tasks done, time spent and the supervisor’s sign-off.
  • Timetables and room bookings that show the sessions took place.
  • Equipment use logs where tools or machines are shared.
  • Supervisor reports summarizing the group’s progress.

A summary per learner, showing total practical hours completed against the requirement, allows the institution to show, at the end of the program, that each graduate met it. Missed hours should be recorded and made up, with the make-up documented.

Supervision and Assessment

Hours without supervision are not training. Show who supervised each session, their qualifications and their ratio to learners. Link the practical hours to assessment: each competency should be assessed by observation, with a record of the criteria and the result. Hours and assessments should be consistent. If a learner is recorded as having done 90 hours of practical work but has no assessed competencies, a reviewer will ask why. See competency-based assessment in vocational programs.

Training at Employers

Where part of the training takes place at an employer, the institution remains responsible. Document:

  • a written agreement with each employer, stating tasks, supervision, working hours, safety and insurance;
  • a learning plan for each learner, linked to the competencies;
  • a workplace logbook, signed by the workplace supervisor and checked by the institution;
  • visits or contact by an institution staff member, with notes;
  • assessment, usually a combination of workplace supervisor input and institution assessment.

Hours of ordinary work that are not part of a planned and assessed learning activity should not be counted as training hours. EAHEA’s credit systems do not give credit for work experience that is not an assessed learning activity. See apprenticeships and work-based learning: evidence for an accreditation review.

Stating the Total Workload

Combine practical hours with the other components to give total nominal workload: instruction, practical work, guided self-study (at the factor the provider states, with 0.75 the usual value) and assessment. For a program of 150 hours or less, EAHEA’s credit systems use Modular Units of Competency (MUC) at every level. A professional certificate, associate or bachelor-level program of more than 150 hours uses Professional Advancement Credits (PAC), at 20 to 25 hours per credit. See workload hours, credits and skills training and EAHEA Credit Systems.

Checking the Numbers

  1. Compare the planned hours in the specification with the hours in the timetable.
  2. Compare timetable hours with attendance records for a sample of learners.
  3. Check that the total for each learner meets the requirement.
  4. Check that the capacity of workshops can support the planned numbers.
  5. Check that assessment records exist for each competency practiced.

Do this check yourself before the review. Gaps found internally are fixed. Gaps found by reviewers are questions.

Common Mistakes

  • Counting scheduled hours as delivered hours.
  • Counting breaks and travel.
  • No record of who supervised.
  • Workplace hours that are ordinary work with no learning plan.
  • Different totals in different documents.
  • Capacity that cannot match the planned numbers.

Fees follow the World Bank country income classification and are listed on the Service Fees page. Apply online or contact the Secretariat. For the facilities side, see workshops, equipment and facilities.

Services This Guide Covers

Frequently Asked Questions

An hour in which the learner performs, under supervision, the tasks of the occupation, such as workshop, laboratory, simulated or workplace tasks. Breaks, travel and waiting time are not counted.

Attendance registers, learner logbooks, timetables and room bookings, equipment use logs and supervisor reports.

If they are part of a planned and assessed learning activity with supervision and a learning plan. Ordinary work that is not an assessed learning activity does not count toward EAHEA credits.

They form part of total nominal workload. Programs of 150 hours or less are credited in MUC, and longer professional programs in PAC, for example.

The hours should be recorded as missed and made up, with the make-up documented.

It should not. Reviewers compare planned hours with workshop capacity, supervision ratios and attendance records.